UCSB PHYSICAL FACILITIES
CLASSROOM DESIGN AND RENOVATION

2018 PROJECTS - Page 1


Page 2 of 2
Accomplishments 2008-2017
Classroom Renovation Program

Buchanan Hall 1910

BEFORE

 

AFTER

Replace entrance sign.
 

 


Buchanan Hall 1930

BEFORE

 

AFTER

Repaint interior doors.
 

 


Buchanan Hall 1940

BEFORE

 

AFTER

Replace entrance sign.
 

 


Chemistry 1171

BEFORE

 

AFTER

Replace periodic table.
 
     
Patch and paint side wall.
 

 

Embarcadero Hall

BEFORE

 

AFTER

Paint side wall.
 
     
Patch and paint rear wall.
 

 


Girvetz Hall 1004

BEFORE

 

AFTER

Repaint entrance door.
 

 


Girvetz Hall 1115

BEFORE

 

AFTER

Repaint walls as necessary.

 


Girvetz Hall 2108

BEFORE

 

AFTER

Repaint walls as necessary.

 

 


Girvetz Hall 2119

BEFORE

 

AFTER

Repaint walls as necessary.

 

 


Harold Frank Hall 1104

BEFORE

 

AFTER

Patch and paint side and rear walls.
 
     
 
     
 

 


Page 2 of 2
Accomplishments 2008-2017
Classroom Renovation Program