UCSB PHYSICAL FACILITIES
CLASSROOM DESIGN AND RENOVATION

2018 PROJECTS - Page 2


Page 1 of 2
Accomplishments 2008-2017
Classroom Renovation Program

HSSB 1174

BEFORE

 

AFTER

Replace missing acoustic panel.
 
     
Repair entry wall and install edge protector.
 

 


HSSB 1207

BEFORE

 

AFTER

Refinish interior of door.
 

 


HSSB 1233

BEFORE

 

AFTER

Eliminate old and unused camera mount. Patch and paint.
 

 


HSSB 3201

BEFORE

 

AFTER

Refinish interior of door.
 

 


HSSB 1236

BEFORE

 

AFTER

Add chair rail to rear wall.
 

 


HSSB 2201

BEFORE

 

AFTER

Repaint entrance door.
 

 


Phelps 1260

BEFORE

 

AFTER

Repaint entrance door.
 

 


Phelps 1440

BEFORE

 

AFTER

Repaint entrance door.
 

 


Phelps 1508

BEFORE

 

AFTER

Repaint entrance door.
 

 


Page 1 of 2
Accomplishments 2008-2017
Classroom Renovation Program