UCSB PHYSICAL FACILITIES
CLASSROOM DESIGN AND RENOVATION

2016 RENOVATIONS


Page 1
Page 2
Accomplishments 2008-2016
Classroom Renovation Program

Arts 1349

BEFORE

 

AFTER

Install chair rails.
 

 


Arts 1353

BEFORE

 

AFTER

Install chair rails.
 

 


Arts 1356

BEFORE

 

AFTER

Install chair rails.
 
     
Paint front wall.
 

 


Broida 1610

BEFORE

 

AFTER

Patch and paint walls, doors, and railing.
 
     
 
     
 
     
 
     
 
     
Refinish entry cabinets.
 
     
Reinstall exit signs.
 

 


Broida 1640

BEFORE

 

AFTER

Refinish entry doors.
 
     
Paint railings in rear of lecture hall.
 
 
Remove old slide projector hardware. Patch and paint.
 
     
Patch and paint rear wall.
 
Patch and paint side wall.
 

 


Buchanan 1910

BEFORE

 

AFTER

Replace entry sign.
 

 


Campbell Hall

BEFORE

 

AFTER

Patch and paint walls in lobby.
 
     
 

 


Chemistry 1171

BEFORE

 

AFTER

Patch and repaint rear door.
 
     
Replace missing threshold plate.
 

 


Chemistry 1179

BEFORE

 

AFTER

Patch floor near chalkboards.
 

 


Girvetz 1004

BEFORE

 

AFTER

Repaint wall above chalkboards.
 
     
Paint entrance doors.
 

 


Girvetz 2110

BEFORE

 

AFTER

Eliminate obsolete wiremold. Repaint front wall.
 

 


Girvetz 2112

BEFORE

 

AFTER

Patch and paint wall. Install chair rail.
 

 


Girvetz 2115

BEFORE

 

AFTER

Repaint front wall.
 

 


Girvetz 2119

BEFORE

 

AFTER

Remove obsolete wiremold. Patch and paint.
 

 


Girvetz 2128

BEFORE

 

AFTER

Replace broken window.
 

 


Harold Frank Hall 1104

BEFORE

 

AFTER

Clean or replace carpet tiles.
 
     
Patch and paint entry wall.
 
     
Replace portion of rear carpeted wall.
 
     
Repair door guard in entry to lecture hall.
 
     
Remove obsolete wiremold. Patch and paint.
 

 


HSSB 1173

BEFORE

 

AFTER

Patch and paint walls.
 
     
 
     
Reupholster or deep-clean acoustic wall panels.
 

 


HSSB 1174

BEFORE

 

AFTER

Patch and paint side wall.
 
     
Reupholster or deep-clean acoustic wall panels.
 

 


HSSB 2202

BEFORE

 

AFTER

Paint classroom door.
 

 


HSSB 3201

BEFORE

 

AFTER

Patch and paint.
 
     
 
     
 

 


HSSB 3202

BEFORE

 

AFTER

Patch and paint wall adjacent to chalkboard.
 

 


HSSB 4201

BEFORE

 

AFTER

Patch and paint classroom door.
 

 


HSSB 4202

BEFORE

 

AFTER

Patch and paint side wall.
 

 


Life Sciences 1001

BEFORE

 

AFTER

Paint entrance door.
 
     
Reupholster acoustic panel.
 

 


Page 1
Page 2
Accomplishments 2008-2016
Classroom Renovation Program