UCSB PHYSICAL FACILITIES
CLASSROOM DESIGN AND RENOVATION

2016 RENOVATIONS


Page 1
Page 2
Accomplishments 2008-2016
Classroom Renovation Program

North Hall 1006

BEFORE

 

AFTER

Install frames on acoustic panels.
 

 


North Hall 1105

BEFORE

 

AFTER

Patch and paint rear wall.
 

 


North Hall 1109

BEFORE

 

AFTER

Patch and paint front and rear walls.
 
     
 
     
Refinish door.
 

 


Phelps 1425

BEFORE

 

AFTER

Install permanent AC for data projector.
 

 


Phelps 1448

BEFORE

 

AFTER

Repaint door.
 

 


Phelps 1508

BEFORE

 

AFTER

Remove obsolete screen on side of classroom. Patch and paint.
 
     
Clean and paint vents.
 

 


Phelps 2514

BEFORE

 

AFTER

Install chair rail on rear wall.
 
     
Paint door.
 

 


Phelps 2516

BEFORE

 

AFTER

Add white boards.
 
     
Paint wall and install chair rail.
 
     
Paint door.
 

 


Phelps 2524

BEFORE

 

AFTER

Add white boards.
 
     
Clean T-bar ceiling and repaint as necessary.
 

 


Phelps 3515

BEFORE

 

AFTER

Patch and paint rear wall.
 

 


Phelps 3519

BEFORE

 

AFTER

     
Patch and paint rear wall.
 

 


Phelps 3523

BEFORE

 

AFTER

Paint side wall.
 
     
Patch and paint rear wall.
 

 


Psychology 1902

BEFORE

 

AFTER

Eliminate obsolete AC floor outlets (trip hazards).
 

 


Psychology 1924

BEFORE

 

AFTER

Patch and paint wall below chalkboard.
 

 


South Hall 1430

BEFORE

 

AFTER

Patch and paint rear wall.
 
     
Eliminate old bulletin boards - Entrances to SH 1430 and 1431
 

 


Theater-Dance 1701

BEFORE

 

AFTER

Patch and paint entry and rear walls.
 
     
Paint rear of classroom.
 

 


Theater-Dance 2600

BEFORE

 

AFTER

Patch and paint side and concrete block walls.
 
     
 

 


Webb Hall 1100

BEFORE

 

AFTER

Patch and paint all walls.
 
     
 
     
 
     
 

 


Page 1
Page 2
Accomplishments 2008-2016
Classroom Renovation Program