UCSB PHYSICAL FACILITIES
CLASSROOM DESIGN AND RENOVATION
Page 2 |
|
North Hall 1006 |
||
BEFORE |
AFTER |
|
Install frames on acoustic panels. |
||
![]() |
![]() |
|
North Hall 1105 |
||
BEFORE |
AFTER |
|
Patch and paint rear wall. |
||
![]() |
![]() |
|
North Hall 1109 |
||
BEFORE |
AFTER |
|
Patch and paint front and rear walls. |
||
![]() |
![]() |
|
![]() |
![]() |
|
Refinish door. |
||
![]() |
![]() |
|
Phelps 1425 |
||
BEFORE |
AFTER |
|
Install permanent AC for data projector. |
||
![]() |
![]() |
|
Phelps 1448 |
||
BEFORE |
AFTER |
|
Repaint door. |
||
![]() |
![]() |
|
Phelps 1508 |
||
BEFORE |
AFTER |
|
Remove obsolete screen on side of classroom. Patch and paint. |
||
![]() |
![]() |
|
Clean and paint vents. |
||
![]() |
![]() |
|
Phelps 2514 |
||
BEFORE |
AFTER |
|
Install chair rail on rear wall. |
||
![]() |
![]() |
|
Paint door. |
||
![]() |
![]() |
|
Phelps 2516 |
||
BEFORE |
AFTER |
|
Add white boards. |
||
![]() |
![]() |
|
Paint wall and install chair rail. |
||
![]() |
![]() |
|
Paint door. |
||
![]() |
![]() |
|
Phelps 2524 |
||
BEFORE |
AFTER |
|
Add white boards. |
||
![]() |
![]() |
|
Clean T-bar ceiling and repaint as necessary. |
||
![]() |
![]() |
|
Phelps 3515 |
||
BEFORE |
AFTER |
|
Patch and paint rear wall. |
||
![]() |
![]() |
|
Phelps 3519 |
||
BEFORE |
AFTER |
|
Patch and paint rear wall. |
||
![]() |
![]() |
|
Phelps 3523 |
||
BEFORE |
AFTER |
|
Paint side wall. |
||
![]() |
![]() |
|
Patch and paint rear wall. |
||
![]() |
![]() |
|
Psychology 1902 |
||
BEFORE |
AFTER |
|
Eliminate obsolete AC floor outlets (trip hazards). |
||
![]() |
![]() |
|
Psychology 1924 |
||
BEFORE |
AFTER |
|
Patch and paint wall below chalkboard. |
||
![]() |
![]() |
|
South Hall 1430 |
||
BEFORE |
AFTER |
|
Patch and paint rear wall. |
||
![]() |
![]() |
|
Eliminate old bulletin boards - Entrances to SH 1430 and 1431 |
||
![]() |
![]() |
|
Theater-Dance 1701 |
||
BEFORE |
AFTER |
|
Patch and paint entry and rear walls. |
||
![]() |
![]() |
|
Paint rear of classroom. |
||
![]() |
![]() |
|
Theater-Dance 2600 |
||
BEFORE |
AFTER |
|
Patch and paint side and concrete block walls. |
||
![]() |
![]() |
|
![]() |
![]() |
|
Webb Hall 1100 |
||
BEFORE |
AFTER |
|
Patch and paint all walls. |
||
![]() |
![]() |
|
![]() |
![]() |
|
![]() |
![]() |
|
![]() |
![]() |
|
Page 2 |
|