UCSB PHYSICAL FACILITIES
CLASSROOM DESIGN AND RENOVATION

2017 PROJECTS


Accomplishments 2008-2017
Classroom Renovation Program

Buchanan Hall 1930

BEFORE

 

AFTER

Patch and paint ceiling above the projection screen.
 

 


Chemistry 1179

BEFORE

 

AFTER

Repair rear wall and install edge protector.
 

 


Girvetz 1004

BEFORE

 

AFTER

Refinish edge of stage.
 

 


Girvetz 1112

BEFORE

 

AFTER

Repair floor surrounding computer lectern.
 

 


Girvetz 2112

BEFORE

 

AFTER

Refinish doors.
 

 


Girvetz 2115

BEFORE

 

AFTER

Replace vent. Patch and paint.
 

 


Girvetz 2123

BEFORE

 

AFTER

Replace vent. Patch and paint.
 

 


Girvetz 2129

BEFORE

 

AFTER

Refinish doors.
 
     

 


Girvetz 2135

BEFORE

 

AFTER

Replace vent. Patch and paint.
 

HSSB 1210

BEFORE

 

AFTER

Remove obsolete blind hardware. Patch and paint.
 

 


HSSB 1231

BEFORE

 

AFTER

Remove obsolete blind hardware. Patch and paint.
 

 


HSSB 1236

BEFORE

 

AFTER

Refinish interior of door.
 

 


HSSB 3201

BEFORE

 

AFTER

Repair damaged edge of wall and replace missing baseboard.
 

 


Isla Vista Theater 1

BEFORE

 

AFTER

Patch and repaint damaged walls.
 
     
 

 


Isla Vista Theater 2

BEFORE

 

AFTER

Eliminate trip hazards in emergency exit.
 
     
 
     
Repaint walls as necessary.
 
     
 
     
 

North Hall 1006

BEFORE

 

AFTER

Paint area below chalkboards to match front wall.
 

 


Phelps 1444

BEFORE

 

AFTER

Paint ceiling vent.
 

 


Phelps 1445

BEFORE

 

AFTER

Clean and paint vent.
 

 


Phelps 1448

BEFORE

 

AFTER

Clean and paint vent.
 

 


South Hall 1609

BEFORE

 

AFTER

Remove old mouting bolts from wall. Patch and paint.
 
 
 
     
Paint ceiling.
 

 


80 General Assignment Classrooms

BEFORE

 

AFTER

Replace warn screen pulls.
 

Accomplishments 2008-2016
Classroom Renovation Program