UCSB PHYSICAL FACILITIES
CLASSROOM DESIGN AND RENOVATION
Work in 2015 primarily related to ongoing maintenance needs not pictured here (e.g. lighting, seat repair, replacement of blinds, etc).
Bldg 387 Room 103 |
||
BEFORE |
AFTER |
|
Patch and paint rear wall. Repaint all walls. |
||
![]() |
![]() |
|
Bldg 387 Room 104 |
||
BEFORE |
AFTER |
|
Patch and paint rear wall. |
||
![]() |
![]() |
|
Buchanan 1910 |
||
BEFORE |
AFTER |
|
Paint over graffitti in rear of classroom. |
||
![]() |
![]() |
|
Finish and repaint entry wall. |
||
![]() |
![]() |
|
Buchanan 1934 |
||
BEFORE |
AFTER |
|
Paint T-bar grid and replace old ceiling tiles. |
||
![]() |
![]() |
|
Chemistry 1179 |
||
BEFORE |
AFTER |
|
Patch and paint rear wall. |
||
![]() |
![]() |
|
Girvetz 1112 |
||
BEFORE |
AFTER |
|
Patch and repaint wall. |
||
![]() |
![]() |
|
Girvetz 1116 |
||
BEFORE |
AFTER |
|
Patch and repaint rear wall. |
||
![]() |
![]() |
|
Girvetz 2110 |
||
BEFORE |
AFTER |
|
Repaint door jamb. |
||
![]() |
![]() |
|
Girvetz 2112 |
||
BEFORE |
AFTER |
|
Replace damaged blind and ceiling tile. |
||
![]() |
![]() |
|
Repaint door jamb. |
||
![]() |
![]() |
|
Girvetz 2115 |
||
BEFORE |
AFTER |
|
Patch and paint area beneath chalkboard. |
||
![]() |
![]() |
|
Girvetz 2119 |
||
BEFORE |
AFTER |
|
Remove old ventilation port from window. |
||
![]() |
![]() |
|
Repaint door jamb. |
||
![]() |
![]() |
|
Harold Frank Hall 1104 |
||
BEFORE |
AFTER |
|
Patch and paint side wall. |
||
![]() |
![]() |
|
Replace top of instructor's cabinet. |
||
![]() |
![]() |
|
Replace edging. |
||
![]() |
![]() |
|
Revised: January 9, 2016 |