UCSB PHYSICAL FACILITIES
CLASSROOM DESIGN AND RENOVATION

2015 RENOVATIONS

Work in 2015 primarily related to ongoing maintenance needs not pictured here (e.g. lighting, seat repair, replacement of blinds, etc).


Bldg 387 Room 103

BEFORE

 

AFTER

Patch and paint rear wall. Repaint all walls.
 

 


Bldg 387 Room 104

BEFORE

 

AFTER

Patch and paint rear wall.
 

 


Buchanan 1910

BEFORE

 

AFTER

Paint over graffitti in rear of classroom.
 
     
Finish and repaint entry wall.
 

 


Buchanan 1934

BEFORE

 

AFTER

Paint T-bar grid and replace old ceiling tiles.
 

 


Chemistry 1179

BEFORE

 

AFTER

Patch and paint rear wall.
 

 


Girvetz 1112

BEFORE

 

AFTER

Patch and repaint wall.
 

 


Girvetz 1116

BEFORE

 

AFTER

Patch and repaint rear wall.
 

 


Girvetz 2110

BEFORE

 

AFTER

Repaint door jamb.
 

 


Girvetz 2112

BEFORE

 

AFTER

Replace damaged blind and ceiling tile.
 
     
Repaint door jamb.
 

 


Girvetz 2115

BEFORE

 

AFTER

Patch and paint area beneath chalkboard.
 
     

 


Girvetz 2119

BEFORE

 

AFTER

Remove old ventilation port from window.
 
     
Repaint door jamb.
 

 


Harold Frank Hall 1104

BEFORE

 

AFTER

Patch and paint side wall.
 
     
Replace top of instructor's cabinet.
 
     
Replace edging.
 

 


NEXT - HSSB, LSB, North Hall, Phelps, and Webb

RETURN TO MAIN ACCOMPLISHMENTS PAGE

 

Revised: January 9, 2016