UCSB PHYSICAL FACILITIES
CLASSROOM DESIGN AND RENOVATION

2015 RENOVATIONS

Work in 2015 primarily related to ongoing maintenance needs not pictured here (e.g. lighting, seat repair, replacement of blinds, etc).


HSSB 1207

BEFORE

 

AFTER

Patch and repaint side wall.
 

 


HSSB 1211

BEFORE

 

AFTER

Repaint front wall.
 

 

HSSB 1224

BEFORE

 

AFTER

Remove old studs, patch and paint wall.
 
     
Paint front wall.
 

 


HSSB 1228

BEFORE

 

AFTER

Remove old mounting studs. Patch and paint.
 
 
Repaint front wall.
 

 


HSSB 1237

BEFORE

 

AFTER

Repair damaged wall.
 

 


HSSB 2251

BEFORE

 

AFTER

Replace damaged ceiling tiles.
 
     
Repair and repaint damaged rear wall.
 

 


HSSB 3201

BEFORE

 

AFTER

Repaint damaged walls and window sills.
 
     
 

 


HSSB 4202

BEFORE

 

AFTER

Repair and paint damaged wall.
 

 


Life Sciences 1101

BEFORE

 

AFTER

Patch and repaint rear wall.
 

 


North Hall 1111

BEFORE

 

AFTER

Patch and repaint walls.
 
     
 

 


Phelps 1425

BEFORE

 

AFTER

Patch and paint rear wall.
 

 


Phelps 1440

BEFORE

 

AFTER

Remove obsolete wiremold from rear wall. Patch and paint.
 
     
 

 


Phelps 1444

BEFORE

 

AFTER

Patch and paint walls.
 
     
 

 


Phelps 1445

BEFORE

 

AFTER

Patch and paint rear wall.
 

 


Phelps 1448

BEFORE

 

AFTER

Patch and paint rear wall.
 

 


Phelps 1508

BEFORE

 

AFTER

Patch and paint holes in front and rear walls.
     
 

 


Phelps 3519

BEFORE

 

AFTER

Patch and paint rear wall.
 

 


 

Webb 1100

BEFORE

 

AFTER

Repair damaged demonstration table.
 

 


RETURN TO PAGE 1 OF 2015 RENOVATIONS

RETURN TO MAIN ACCOMPLISHMENTS PAGE

 

Revised: January 9, 2016