UCSB PHYSICAL FACILITIES
CLASSROOM DESIGN AND RENOVATION

2013 RENOVATIONS - BUCHANAN HALL


BUCHANAN HALL 1910

BEFORE

 

AFTER

Replace room sign.
 
     
Replace sign.
 
     
Remove graffitti.
 
     
Paint doors.
 
     
Paint interior doors.
 
     
Paint interior walls.
 
     
Repair flooring.
 
     
Repaint for safety.
 
     
Replace old control panel.
 

 


 

BUCHANAN HALL 1920

BEFORE

 

AFTER

Repaint entry doors.
 
     
Repaint interior of doors.
 
     
Repaint interior doors.
 
     
Replace pencil sharpener.
 

 


BUCHANAN HALL 1930

BEFORE

 

AFTER

Repaint exterior doors.
 
     
Repaint interior doors.
 
     
Repaint entry walls and doors.
 
     
Paint front wall and replace baseboards.
 
     
Repair flooring.
 

 


BUCHANAN HALL 1940

BEFORE

 

AFTER

Repaint exterior doors.
 
     
Repaint interior doors.
 
     
Repaint entry doors.
 
     
Repaint entry walls.
 

 


 

   
  BLDG 387 BUCHANAN GIRVETZ HSSB LIFE SCIENCES  
 
PHELPS
SOUTH HALL
WEBB HALL