PRIORITIES AND COST ESTIMATE

     
 

One tile is missing and several tiles have come loose creating trip hazards. Recommend replacing individual tiles with truncated dome panels set in concrete.

1-A5

     
 

Several tiles have come loose creating trip hazards. Recommend replacing individual tiles with truncated dome panels set in concrete.

 

1-A6
(1 of 2)

     
 

Several tiles have come loose creating trip hazards. Recommend replacing individual tiles with truncated dome panels set in concrete.

 

 

1-A6
(2 of 2)

     
 

Individual truncated domes have come loose and become trip hazards. They should be replaced with newer larger panels.

2-S1

(1 of 4)

     
 

Closeup of above

2-S1

(2 of 4)

     
 

Closeup of above

2-S1

(3 of 4)

     
 

Closeup of above

2-S1

(4 of 4)

     
 

Closeup of above

2-S2
(1 of 4)

     
 

Closeup of above

2-S2
(2 of 4)

     
 

Closeup of above

2-S2
(3 of 4)

     
 

Closeup of above

2-S2
(4 of 4)

     
 

Adhesives have been unsuccessful in securing some truncated dome panels. Recommend replacing panels wet-set in concrete.

 

3-B14

     
 

Individual truncated domes have broken loose creating trip hazards. They should be replaced with newer larger panels.

 

4-B10

     
 

Adhesives have been unsuccessful in securing this truncated dome panel. Recommend replacing damaged panels wet-set in concrete.

 

4-D4

     
 

Truncated domes should be installed on the south side of UCen Road in line with Sciences Walk.

The crossing should not be at an angle.

8-A7

(1 of 3)

     
 

The wide white line separating automobile from pedesrian traffic should be repainted.

8-A7

(2 of 3)

     
 

The location of the truncate domes should be in line with Sciences Walk and the original yellow (now faded) paint.

8-A7

(1 of 3)