UCSB ROAD MAINTENANCE PROGRAM

FACULTY CLUB ROAD - Option 1

OPTION 1

 


Replacement of significant portions of the road (in black) between the Faculty Club and the UCen planned.

 
1 - Existing speed bump: eliminate or modify
to make it less of a pedestrian trip hazard.
   
 
2 - Existing speed bump: probably replace and repaint.
   
 
3 - Widen parking area for commencement needs.

POSTPONED
   
 
4 - Replace curb. Obtain cost estimates for both asphalt and concrete options.
   
 
5 - Repair or replace existing asphalt curb.
   
 

6 - Obtain an estimate for an extension to the retaining wall closer to the UCen.

   
 
7 - Extend the asphalt roadway all the way to the retaining wall.
   

July 21, 2018