OPTION 1 |
Replacement of significant portions of the road (in black) between the Faculty Club and the UCen planned.
1 - Existing speed bump: eliminate or modify
to make it less of a pedestrian trip hazard. 2 - Existing speed bump: probably replace and repaint. 3 - Widen parking area for commencement needs.
POSTPONED 4 - Replace curb. Obtain cost estimates for both asphalt and concrete options. 5 - Repair or replace existing asphalt curb.6 - Obtain an estimate for an extension to the retaining wall closer to the UCen.
7 - Extend the asphalt roadway all the way to the retaining wall.
July 21, 2018