UCSB CLASSROOM RENOVATION PROGRAM
Girvetz 1106
BEFORE
AFTER
Remove tape residue from entry door.
Replace missing ceiling tile.
Replace obsolete control panel with a painted blank cover plate (ID).
Revised: September 26, 2014